CONCRETE & STEEL CONSTRUCTION! This naturally bright TOP FLOOR SUITE at Shaughnessy Square has an open plan featuring fully equipped kitchen w/BREAKFAST BAR, s/s appliances, tile backsplash. Living/dining area has GAS FIREPLACE (incl in maintenance fee) & direct access to COVERED BBQ PATIO, perfect for wine or watching the sunset. Bedroom is KING SIZE FRIENDLY, has 2nd access to patio, large double closets & cheater door to full 4pc bathroom. BONUSES INCLUDE: in-suite laundry, 2 dogs allowed (no size/breed restrictions), concrete/steel construction = less noise transfer than traditional wood frame, 2 PARKING SPOTS, STORAGE LOCKER, exercise centre. WALK TO: various parks + the Coquitlam River, Shaughnessy Station Mall, Westcoast Express, transit stops, schools of all levels.
Central Location, Recreation Nearby, Shopping Nearby
Elevator, Exercise Centre, In Suite Laundry, Storage
Park View
STRATA LOT 104, PLAN LMS4193, DISTRICT LOT 464, GROUP 1, NEW WESTMINSTER LAND DISTRICT, TOGETHER WITH AN INTEREST IN THE COMMON PROPERTY IN PROPORTION TO THE UNIT ENTITLEMENT OF THE STRATA LOT AS SHOWN ON FORM 1
Dist to Public Trans:
STEPS
Dist to School Bus:
STEPS
Property Disclosure:
No
Fixtures Leased:
No
Fixtures Removed:
Yes
Cats:
Yes
Dogs:
Yes
Units in Development:
173
Plumbing Details:
No
Services Connected:
Community, Electricity, Natural Gas, Sanitary Sewer, Storm Sewer, Water
The data relating to real estate on this website comes in part from the MLS® Reciprocity program of either the Real Estate Board of Greater Vancouver (REBGV), the Fraser Valley Real Estate Board (FVREB) or the Chilliwack and District Real Estate Board (CADREB). Real estate listings held by participating real estate firms are marked with the MLS® logo and detailed information about the listing includes the name of the listing agent. This representation is based in whole or part on data generated by either the REBGV, the FVREB or the CADREB which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent of either the REBGV, the FVREB or the CADREB.